On Tue, Dec 2, 2008 at 10:21 AM, Vincent Massol <[email protected]> wrote:
Hi there,
With XE 1.7 we're going to release some features that don't have the final planned UI (insert link, image, macro, table for example). We're still discussing the final UI designs but I'd like that we get started doing 2 things:
Re the implementation roadmap I feel it would be good to (iteratively) release the UIs in 1.7.x releases (1.7.1, 1.7.2, etc) as fast as we can. The reason is that we initially wanted to have them in 1.7 final and we're late since the wysiwyg implementation took longer than planned. Waiting for 1.8 would be too long I think.
Ideally IMO it would be good if we could have most of them done before December end.
We need to know if that's possible and define a roadmap.
We don't think it's possible to have the UI implemented till the end of december for the following reasons: 1) We must take into account that december is .. december, with its days off so we should count 3 weeks and not 4. 2) Fixing bugs of the current features will keep the WYSIWYG team busy for around 2 weeks. 3) Implementing the design will take time because we need to look for widgets that offer some of the functionalities that we want (in which case we'll loose time customizing them, and from the bad experience Marius had with GWT widgets he think we'll spent some time on this) or implement our own widgets but this will take even more time. You're right to say that waiting for 1.8 is too long, we could do the following : - Release 1.7.1 around december 15th with WYSIWYG bugfixes, probably some minor UI improvements (no use of an external widget toolkit). - Prepare a WYSIWYG UI roadmap ending during january end (just before 1.8M2), release XE 1.7.2 somewhere during the last week of january. WDYT ? JV.