Also the design for our Download page might not be optimal with this change. Users will have to go more to the Other versions if they will be 'recommended' a particular version (just like I said if they will adopt some odd/even or divisibility by 5 rule, etc). Thanks, Caty On Thu, Sep 15, 2016 at 12:40 PM, Ecaterina Moraru (Valica) < [email protected]> wrote:
+0 I'm not thrilled since: - it will put pressure on the RMs (there are several steps additional done for final releases + the ci needs to be shiny perfect + increases the number of jobs and branches for versions + branches for partial features); - in theory all the releases should be tested fully (before we had a buffer to catch bugs between Ms + more time for the community to test the releases) and - the roadmap items planning might need more issues/bureaucracy.
Also users might be confused about the 'quality'/frequency of releases and they might adopt strategies like installing even/odd release version or just bugfix releases. So I'm not sure this will fix use case in terms of users feedback.
It's just a feeling I have and I'm a bit worried since our community is small, but maybe I'm just resistant to change. I'm willing to try though.
I would prefer 10 releases N.0 to N.9 (just for 'esthetic' reasons). Also I would have prefer to start this new version/release scheme for the 9.x cycle, instead of butchering the 8.4+ stabilization releases (for 'consistency' reasons).
Thanks, Caty
On Thu, Sep 15, 2016 at 12:18 PM, Vincent Massol <[email protected]> wrote:
Hi devs,
Executive summary: * Replace our 3 month release cycle by a 1 month release cycle.
Needs and advantages: * Be able to get our changes faster to our users. Importantly, bugfixes are released faster to users. Note: it’s not because we release faster that our users have to upgrade as fast. They can skip some versions if they want/need. * Be able to get more feedback more quickly from users. Right now, most (if not all) of our users are testing only final versions. They’re not testing milestones or RCs and thus we usually only know about problems after the final has been released and we incorporate the change in the next one (to be released 3 months later) or we have to do a bugfix release. * Get closer to cloud needs. Nowadays, could offerings happen more and more and operating a cloud means bringing improvements and fixes as fast as possible. Some software in the cloud are even updated/patched several times per day. We’re not there yet but we’re trying to get closer by reducing from 3 months to 1 month * This also means more marketing for the xwiki project since other site relay the new whenever a final version is released
Proposal Details: * 1 month split in: 3 weeks to release a RC + 1 week to release the final version. It’s very important to keep the RC as a meeting point and ensuring all is going to be ready on time for the final release (jiras are closed or moved to the next release, CI is passing, documentation and RN are ready, etc). * Split large features into smaller chunks. It doesn’t matter if some code is released but unused for example (provided the build is passing). For larger refactoring that absolutely cannot be split into 3 weeks chunks (I’m not sure that really exists) then we can use branches (and create a CI job to ensure integration). * Less need for bugfix releases of stable versions. For LTS it’s still required though. * Note that this 1 month release strategy will not generate more releases (and thus more work) over the year since we’re already releasing every 2-3 weeks ATM (milestones, RCs, et) * Version Naming: from N.0 to N.10 where N is the cycle name. The reason for 11 releases and not 12 is to account for slippages + potential bugfix release at the end of the cycle for stabilization + holidays. We might even be able to do only 10 releases and not 11 but I’m suggesting we try with 11 for now.
When: * I’m proposing to start this process with the 8.4 release (starting on the 10th of October). Since that version is already supposed to be a stabilization release (and thus a short 1 month release) it’s not going to change anything. We should also do bugfix releases after 8.4 is releases: 8.4.1, 8.4.2, etc till the end of the year * Then starting 9.0 we really start doing 1 month releases.
WDYT?
Here’s my +1 to try this.
Thanks -Vincent