On Sun, Feb 10, 2019 at 3:50 PM Vincent Massol <vincent(a)massol.net> wrote:
Hi devs,
After TAKE 2 (see
http://markmail.org/message/owtyhkmrz4tcbymn ), and
after analyzing several modules (I analyzed about 4-5 in total), I think we
should improve a bit the strategy to make it usable and applicable.
Lessons learnt
============
* It takes a lot of time to analyze a single global tpc drop (every time
it takes me around 2 hours)
* In general the results of the analysis are not that great. There are
often “good enough” reasons for the drop. It’s often a lack of unit tests
and code that is exercised by functional tests but the path has changed for
various reasons.
* I find the ratio of time to spend on the analysis vs result to be too
low.
* In the end what’s important is that our global TPC continues to grow
New Strategy
===========
* We run the Clover Jenkins pipeline every night (between 11PM-8AM)
* The pipeline sends an email whenever the new report has its global TPC
going down when compared with the baseline (vs one or more modules had
their TPC lowered in TAKE 2)
* The baseline report is the report generated just after each XS release.
This means that we keep the same baseline during a XS release
** Technically it means that the pipeline will update the latest.txt file
(which contains the clover report timestamp) when it notices a version
change
* We add a step in the Release Plan Template to have the report passing
before we can release.
* The RM is in charge of a release from day 1 to the release day (already
the case), and is also in charge of making sure that the global coverage
job failures get addressed before the release day so that we’re ready on
the release day.
* Implementation detail: don’t send a failure email when there are failing
tests in the build, to avoid false positives
WDYT?
Thanks
-Vincent