Hi devs,
The 3.3 Milestone 2 release was supposed to happen this past Monday, but
the codebase hasn't been stable enough for a release (failing tests, hot
commits triggering comments, unmerged branches).
Proposal 1: Release 3.3 RC 1 next Monday, 21 November, effectively
dropping Milestone 2. This respects the initial schedule, although some
of the targeted features won't be fully usable. This means that everyone
should try to get their code stabilized.
Proposal 2: Lengthen the release by another week, releasing:
- Milestone 2 next Monday, November 21
- RC1 on November 28
- Final on December 5
I'm fine with either one, if the codebase is stable enough for a RC by
next Monday.
--
Sergiu Dumitriu
http://purl.org/net/sergiu/